RPEQ certification on the Gold Coast
Your certifier or council needs an RPEQ engineer’s sign-off. We inspect, design where needed, and issue the Form 15, Form 12 or engineering certification they’ve asked for — including for work that’s already been built.
- Form 15 design certificates and Form 12 aspect inspections
- Retrospective certification for work built without approval
- Show cause notice responses for council and QBCC
Got a deadline from your certifier or council? Call 0499 887 867
Tell us what you need signed off
An RPEQ engineer reviews every enquiry and comes back with the scope and fee. No obligation.
Have a letter from your certifier or council? Mention it and we’ll ask you to send it through.
RPEQ certification for every stage of a Gold Coast project.
Pick what you need to start your quote.
Form 15, Form 12, Form 16 — who signs what.
The most common point of confusion. Here’s where each one fits.
Not sure? Send us your certifier’s or council’s request and we’ll tell you exactly what they need.
Certification your certifier can accept first time.
Inspection or design review
An RPEQ engineer checks the design, or inspects the work on site, before anything is signed.
Engineering where needed
If something doesn’t comply, we design the fix — beams, footings, bracing, connections — so it can be certified.
Official Queensland forms
Form 15 and Form 12 completed on the official templates, with the basis for certification stated.
Sent where it needs to go
Issued to you, your builder or straight to your certifier, ready for the next approval step.
Need the structure designed from scratch? We do that too.
Structural designWhat Gold Coast certifiers and council ask us to sign off.
We’re based in Helensvale and certify work across the city every week.
Retaining walls that need approval
Council requires building approval for retaining walls unless they’re under 1.0 m high and more than 1.5 m from a building or another retaining wall. Walls that need approval generally need an engineered design and a Form 15.
Unapproved decks, patios and enclosures
Often found during a sale or a pool safety inspection. We inspect what’s there, design any upgrades and provide the engineering your certifier needs for retrospective approval.
High-rise unit renovations
Wall removals and balcony alterations in apartment buildings need engineering certification before body corporate and certifier approval. See Surfers Paradise and Broadbeach.
Pools, barriers and walls near water
Pool shells, pool fences on retaining walls and structures near canals in Hope Island, Benowa and Paradise Point. Form 15 for pool fencing.
From your certifier’s request to a signed certificate.
Send us the request
Fill in the form with what your certifier or council has asked for, plus any plans or photos.
Scope and fee confirmed
We confirm which forms you need, whether an inspection is required, and the fee before we start.
Review, inspect, design
We review the design or inspect on site, and design any fixes needed to make the work certifiable.
Certificate issued
Signed Form 15, Form 12 or engineering certification, sent to you or directly to your certifier.
What Gold Coast clients say.
Certification questions, answered in depth.
RPEQ certification questions we get every week.
RPEQ stands for Registered Professional Engineer of Queensland. Engineers must be registered with the Board of Professional Engineers of Queensland (BPEQ) to provide professional engineering services in Queensland, unless they work under the direct supervision of an RPEQ. Structural certification such as a Form 15 or Form 12 for structural work needs to be signed by an RPEQ registered in the relevant area.
If your project needs building approval and involves structural work — footings, slabs, beams, retaining walls, decks, pools or structural changes to an existing building — your certifier will usually ask for RPEQ certification. The fastest way to know is to send us your certifier’s request or your plans.
A Form 15 certifies the design before construction. A Form 12 certifies, after an on-site inspection, that a specific aspect was built to the approved design. Most structural projects need both, at different stages. Your certifier then issues the Form 16 for each stage. Form 12 vs Form 16 explained.
Yes. We inspect the existing work, assess whether it’s structurally adequate and, if it isn’t, design the upgrades needed. Once it complies, we provide the engineering certification your certifier needs for retrospective approval.
Yes. We inspect the work the notice relates to and prepare RPEQ engineering reporting that addresses the issues raised, so you can respond to council or QBCC within your deadline. Send us the notice as early as possible.
It depends on what’s being certified, whether we need to inspect on site, and whether any design work is needed first. A single Form 12 inspection is a smaller job than retrospective certification of an extension. We confirm the scope and fee before we start. What affects engineering fees.
Yes. Tell us who your certifier is and we’ll send the signed forms to them directly, as well as to you.
RPEQ certification across the Gold Coast.
Our office is in Helensvale, on the northern Gold Coast.
Get your RPEQ certification quote.
Send us your certifier’s or council’s request. An RPEQ engineer will tell you what’s needed and the fee.
Tell us what you need signed off
No obligation. Reviewed by an RPEQ engineer.