Show cause notice? RPEQ support on the Gold Coast
Received a show cause notice from the City of Gold Coast or QBCC about a deck, retaining wall, extension or other structure? Our RPEQ engineers inspect it, write the engineering response council needs and design any upgrades, so you can resolve it before it becomes an enforcement notice.
- RPEQ engineering report to support your response
- Upgrade design so the structure can stay and be approved
- Worked to your notice deadline
Deadline close? Call 0499 887 867
Send us your notice
An RPEQ engineer reviews it and tells you what’s needed, the fee and how fast we can deliver. Confidential.
Attach or describe the notice, its response date and photos of the structure.
The show cause notices we respond to most on the Gold Coast.
Pick the closest match to start.
The earlier you respond, the cheaper it is to fix.
- No penalty yet: it’s your chance to respond
- At least 20 business days to reply
- An engineering report can close it here
- Council directs you to apply, fix or remove
- Short appeal period, as little as 5 business days for dangerous structures
- Engineering still needed to comply
- Fines and prosecution become possible
- Council can arrange the work and recover costs
- Selling or insuring the property gets harder
Not sure what needed approval? Read what you can build without council approval in QLD and shed approval fines in QLD.
Engineering that gives council a reason to close the matter.
Notice review
We read the notice with you and confirm exactly what council is alleging and what engineering answers it.
Site inspection
An RPEQ engineer inspects the structure, measures members and connections, and checks footings where they can be exposed.
RPEQ engineering report
A clear, independent report on the structure’s adequacy for your response, and an upgrade design where it falls short.
Path to approval
Once upgrades are done, we certify the work so your building certifier can approve it. Retrospective RPEQ certification
Notice deadline coming up? Send it to us today.
Send my noticeFrom notice to resolved in four steps.
Send us the notice
The notice, its response date, photos of the structure and any plans you have.
Scope, fee and timing
We confirm what’s needed, the fee and when we can deliver, working back from your deadline.
Inspect and report
We inspect on site and issue the RPEQ report, with an upgrade design if needed, for your response to council.
Upgrade and certify
Your builder carries out any upgrades, we check them and certify the work for approval.
What Gold Coast clients say.
Show cause notice questions, answered.
It’s a formal letter from the Gold Coast council (or QBCC) saying it believes an offence may have happened, such as building work done without approval, and inviting you to explain why it shouldn’t take enforcement action. It carries no penalty itself. It’s your chance to respond before an enforcement notice is issued.
Queensland planning law requires council to give you at least 20 business days to respond. The date is on your notice. If you need more time, ask council for an extension in writing before the deadline, and tell them an RPEQ engineer has been engaged.
Facts, not opinions. Usually that means evidence the structure is safe, what you’ll do to make it compliant, and a timeframe. An RPEQ engineering report gives council a qualified, independent position on the structure, which carries far more weight than an owner’s explanation.
Council can then issue an enforcement notice. That can require you to apply for approval, carry out work or demolish the structure within a set time, and not complying can lead to fines. Responding properly at the show cause stage is the cheapest point to resolve it.
Most structures can stay if they comply or can be upgraded to comply. We inspect, assess and design any upgrades, and the work can then be approved by a building certifier. Where removal is genuinely the better option, we’ll tell you.
For most building notices about unapproved or unsafe structures, the engineering is what resolves it. We provide engineering, not legal advice. If the matter is disputed, involves a court appeal or a planning issue beyond the structure, talk to a planning lawyer as well, and we’ll work alongside them.
No, but time is shorter. Appeal periods for an enforcement notice are short, often 20 business days and as little as 5 for a dangerous structure. Send us the notice straight away so we can tell you what engineering is needed and how fast we can deliver it.
It depends on the structure, how much can be seen and whether upgrades need designing. A small deck is a much smaller job than an unapproved extension. We confirm the scope and fee before we start, and we work to your notice date.
Show cause notice support across the Gold Coast.
Our office is in Helensvale, on the northern Gold Coast.
Get RPEQ support for your show cause notice.
Send us the notice and photos. An RPEQ engineer will tell you what’s needed, the fee and how fast we can deliver.
Send us your notice
Confidential. Reviewed by an RPEQ engineer.