Failure to Achieve Dry Basement Car Park in a High-Rise Building with Contiguous Pile Retention System

1. Project Overview A 25-storey residential high-rise development in coastal East coast included a 3 level basement car park constructed below groundwater table. The basement was retained using a contiguous bored pile wall system with shotcrete infill. The design intent…








